{
  "dataset": "Tent Permit Threshold Atlas",
  "description": "Sourced city and county fire or building permit thresholds for event tents, with official URLs and last-verified dates. Not legal or engineering advice; confirm with your fire marshal.",
  "license": {
    "name": "CC BY 4.0",
    "url": "https://creativecommons.org/licenses/by/4.0/",
    "attribution": "TentRentalHQ (https://tentrentalhq.com/)"
  },
  "last_verified": "2026-11-22",
  "disclaimer": "Not legal or engineering advice. Thresholds are quoted from the official pages linked here, as last verified on the date shown. Confirm the current rule with the fire marshal or building official who has jurisdiction over your site.",
  "test_strip_defs": {
    "walled_400": "20×20 (400 sq ft) walled tent",
    "open_600": "20×30 (600 sq ft) open-sided canopy",
    "tent_1800": "30×60 (1,800 sq ft) tent"
  },
  "not_included": [
    "The tent permit ledger of issued Chicago, NYC, Boston and Cambridge permits is not part of this atlas.",
    "A 900 sq ft Miami-Dade fire-permit figure that appears on some blogs is omitted because the official fire PDF we opened did not contain it.",
    "New York City fee and lead-time figures are omitted until the Admin Code source can be re-checked (previous fetch returned 403, then a timeout)."
  ],
  "boundary_attribution": "U.S. Census Bureau, 2024 Cartographic Boundary Files (TIGER/Line), 1:500,000.",
  "jurisdictions": [
    {
      "slug": "las-vegas",
      "name": "Las Vegas",
      "legal_name": "City of Las Vegas (IFC model text as adopted)",
      "state": "NV",
      "kind": "city",
      "status": "sourced",
      "metro_slug": null,
      "walled_trigger_sqft": 400,
      "walled_trigger_text": "Operational permit for a tent in excess of 400 sq ft.",
      "open_or_canopy_trigger_sqft": 700,
      "open_or_canopy_trigger_text": "Open-on-all-sides tents exempt up to 700 sq ft (individual or aggregate without a 12 ft fire break) with 12 ft clearance.",
      "lead_time": null,
      "fees_text": null,
      "other_rules": [],
      "notes": [],
      "test_strip": {
        "walled_400": {
          "need": "no",
          "label": "No",
          "note": "A 400 sq ft tent is not in excess of 400 sq ft under the published IFC wording."
        },
        "open_600": {
          "need": "no",
          "label": "No, if conditions are met",
          "note": "A 600 sq ft open-sided tent is under the 700 sq ft open-on-all-sides exemption, if the 12 ft clearance and fire-break rules are met."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft is in excess of 400 sq ft and above the 700 sq ft open-sided exemption."
        }
      },
      "sources": [
        {
          "title": "Las Vegas Fire & Rescue, Tents and other Membrane Structures (2024)",
          "url": "https://files.lasvegasnevada.gov/fire-rescue/Tents-and-other-Membrane-Structures-2024-Updated.pdf",
          "quote": "An operational permit is required to operate an air-supported temporary membrane structure, a temporary special event structure or a tent having an area in excess of 400 square feet (37 m2).",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/las-vegas/",
      "embed_url": "https://tentrentalhq.com/embed/permit/las-vegas/"
    },
    {
      "slug": "denver",
      "name": "Denver",
      "legal_name": "City and County of Denver",
      "state": "CO",
      "kind": "city",
      "status": "sourced",
      "metro_slug": "denver",
      "walled_trigger_sqft": 200,
      "walled_trigger_text": "Permits for tents 200 sq ft or larger and canopies 400 sq ft and larger.",
      "open_or_canopy_trigger_sqft": 400,
      "open_or_canopy_trigger_text": "Canopies 400 sq ft and larger.",
      "lead_time": "Initial applications 30 days before the event.",
      "fees_text": null,
      "other_rules": [],
      "notes": [],
      "test_strip": {
        "walled_400": {
          "need": "yes",
          "label": "Yes",
          "note": "A 400 sq ft walled tent is 200 sq ft or larger."
        },
        "open_600": {
          "need": "yes",
          "label": "Yes",
          "note": "A 600 sq ft canopy is 400 sq ft and larger."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft exceeds both published tent and canopy thresholds."
        }
      },
      "sources": [
        {
          "title": "Denver Fire Department event guidelines",
          "url": "https://www.denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/Public-Event-Film-Permitting/Public-Event-Permitting/DFD-Event-Guidelines",
          "quote": "Permits for tents 200 sq ft or larger and canopies 400 sq ft and larger.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        },
        {
          "title": "DFD Special Events Guidelines 2024 (PDF)",
          "url": "https://www.denvergov.org/files/assets/public/v/2/fire-department/documents/dfd-special-events-guidelines-2024.pdf",
          "quote": "Same thresholds; initial applications 30 days before the event.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/denver/",
      "embed_url": "https://tentrentalhq.com/embed/permit/denver/"
    },
    {
      "slug": "nashville",
      "name": "Nashville",
      "legal_name": "Metropolitan Nashville and Davidson County",
      "state": "TN",
      "kind": "city",
      "status": "sourced",
      "metro_slug": "nashville",
      "walled_trigger_sqft": 200,
      "walled_trigger_text": "Tent in excess of 200 sq ft or canopy in excess of 400 sq ft.",
      "open_or_canopy_trigger_sqft": 400,
      "open_or_canopy_trigger_text": "Canopy in excess of 400 sq ft.",
      "lead_time": null,
      "fees_text": null,
      "other_rules": [],
      "notes": [
        "The official page includes a fee table; those dollar figures were not extracted in the sourced brief, so they are left blank here."
      ],
      "test_strip": {
        "walled_400": {
          "need": "yes",
          "label": "Yes",
          "note": "A 400 sq ft tent is in excess of 200 sq ft."
        },
        "open_600": {
          "need": "yes",
          "label": "Yes",
          "note": "A 600 sq ft canopy is in excess of 400 sq ft."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft is in excess of both published thresholds."
        }
      },
      "sources": [
        {
          "title": "Nashville Fire Marshal's Office, operational permits",
          "url": "https://www.nashville.gov/departments/fire/fire-marshal-office/operational-permits",
          "quote": "Tent in excess of 200 ft² or canopy in excess of 400 ft².",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/nashville/",
      "embed_url": "https://tentrentalhq.com/embed/permit/nashville/"
    },
    {
      "slug": "portland-or",
      "name": "Portland, OR",
      "legal_name": "City of Portland, Oregon",
      "state": "OR",
      "kind": "city",
      "status": "sourced",
      "metro_slug": null,
      "walled_trigger_sqft": 400,
      "walled_trigger_text": "400 sq ft or more with 3 or more walls, or any tent 700 sq ft or greater.",
      "open_or_canopy_trigger_sqft": 700,
      "open_or_canopy_trigger_text": "Any tent or membrane structure with or without walls that is 700 sq ft or greater. Side-by-side tents over 700 sq ft aggregate without a 12 ft fire break also need a permit.",
      "lead_time": "A complete application packet must be received no later than 21 calendar days before the use date; late filings may be charged double fees.",
      "fees_text": "$250 (4 days or less) / $375 (5 days to 6 months).",
      "other_rules": [],
      "notes": [],
      "test_strip": {
        "walled_400": {
          "need": "yes",
          "label": "Yes",
          "note": "A 400 sq ft tent with 3 or more walls meets “400 square feet or more with 3 or more walls.”"
        },
        "open_600": {
          "need": "no",
          "label": "No",
          "note": "A 600 sq ft open-sided tent is under 700 sq ft and does not have 3 or more walls."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft is 700 sq ft or greater."
        }
      },
      "sources": [
        {
          "title": "Portland Fire & Rescue, outdoor tent or membrane structure permit (300.08 ROT)",
          "url": "https://www.portland.gov/fire/permits-inspections/documents/30008rot-outdoor-tent-or-membrane-structure-permit/download",
          "quote": "A permit from the Fire Marshal’s Office is required for an outdoor tent/membrane structure that meets any of the following: 400 square feet or more with 3 or more walls. Any tent/membrane structure w/ or without walls that is 700 square feet or greater.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/portland-or/",
      "embed_url": "https://tentrentalhq.com/embed/permit/portland-or/"
    },
    {
      "slug": "seattle",
      "name": "Seattle",
      "legal_name": "City of Seattle",
      "state": "WA",
      "kind": "city",
      "status": "sourced",
      "metro_slug": "seattle",
      "walled_trigger_sqft": 400,
      "walled_trigger_text": "More than 400 sq ft. Roof-only exempt up to 700 sq ft.",
      "open_or_canopy_trigger_sqft": 700,
      "open_or_canopy_trigger_text": "Roof-only tents exempt up to 700 sq ft.",
      "lead_time": "30 calendar days to avoid a late fee. Permits last up to 28 days.",
      "fees_text": null,
      "other_rules": [],
      "notes": [
        "At exactly 400 sq ft with walls, two Seattle Fire Department sources use different wording. The tents-and-flameproofing page says “more than 400 sq ft.” The April 28, 2025 Tents and Heaters info sheet says that if a tent has any walls, a permit is required for tents “400 square feet or greater.” The 20×20 test cell below flags that disagreement rather than picking one wording."
      ],
      "test_strip": {
        "walled_400": {
          "need": "conditional",
          "label": "Sources disagree at exactly 400 sq ft",
          "note": "The SFD tents-and-flameproofing page says more than 400 sq ft. The April 28, 2025 info sheet says a permit is required for tents with walls that are 400 square feet or greater."
        },
        "open_600": {
          "need": "no",
          "label": "No, if roof-only",
          "note": "A 600 sq ft roof-only tent is within the published exemption up to 700 sq ft."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft is more than 400 sq ft and above the 700 sq ft roof-only exemption."
        }
      },
      "sources": [
        {
          "title": "Seattle Fire Department, Tents & Flameproofing",
          "url": "https://www.seattle.gov/fire/business-services/special-events/tents-and-flameproofing",
          "quote": "More than 400 sq ft. Roof-only exempt up to 700 sq ft. 30 calendar days to avoid a late fee. Permits last up to 28 days.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        },
        {
          "title": "Seattle Fire Department, Special Events matrix",
          "url": "https://www.seattle.gov/fire/business-services/special-events",
          "quote": "Special events permit matrix (walls and attendance).",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        },
        {
          "title": "Seattle Fire Department, Tents and Heaters info sheet (April 28, 2025)",
          "url": "https://www.seattle.gov/documents/Departments/Fire/Business/SFDTentsHeatersInfoSheet.pdf",
          "quote": "If your tent has any walls, a permit is required for tents 400 square feet or greater.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/seattle/",
      "embed_url": "https://tentrentalhq.com/embed/permit/seattle/"
    },
    {
      "slug": "austin",
      "name": "Austin",
      "legal_name": "City of Austin",
      "state": "TX",
      "kind": "city",
      "status": "sourced",
      "metro_slug": "austin",
      "walled_trigger_sqft": 400,
      "walled_trigger_text": ">400 sq ft with one or more sidewalls, >400 sq ft within 20 ft of a building, or any structure >700 sq ft.",
      "open_or_canopy_trigger_sqft": 700,
      "open_or_canopy_trigger_text": "Any structure greater than 700 sq ft, or greater than 400 sq ft within 20 ft of a building.",
      "lead_time": "Due 10 days before the event (events under 50 people); ACE application 30 days before.",
      "fees_text": "$375 first tent, $75 each additional.",
      "other_rules": [],
      "notes": [],
      "test_strip": {
        "walled_400": {
          "need": "no",
          "label": "No, at exactly 400 sq ft",
          "note": "The published triggers use greater-than 400 sq ft (with sidewalls or within 20 ft of a building). A 400 sq ft tent is not greater than 400 sq ft."
        },
        "open_600": {
          "need": "conditional",
          "label": "Not automatically",
          "note": "A 600 sq ft open-sided tent is not greater than 700 sq ft. It would still need a permit if it is within 20 ft of a building (a site-specific fact we do not assume)."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft is greater than 700 sq ft."
        }
      },
      "sources": [
        {
          "title": "Austin Fire Department, special events",
          "url": "https://www.austintexas.gov/fire/special-events",
          "quote": ">400 sq ft with one or more sidewalls, >400 sq ft within 20 ft of a building, or any structure >700 sq ft.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        },
        {
          "title": "Austin Fire Department tent application (FY26 fees)",
          "url": "https://fs25.formsite.com/AustinFire/TentApplication/index.html",
          "quote": "$375 first tent, $75 each additional. Due 10 days before the event (events under 50 people); ACE application 30 days before.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/austin/",
      "embed_url": "https://tentrentalhq.com/embed/permit/austin/"
    },
    {
      "slug": "san-francisco",
      "name": "San Francisco",
      "legal_name": "City and County of San Francisco",
      "state": "CA",
      "kind": "city",
      "status": "sourced",
      "metro_slug": "san-francisco-napa",
      "walled_trigger_sqft": 400,
      "walled_trigger_text": "Bulletin applies to tents in excess of 400 sq ft. Open-sided exempt up to 700 sq ft.",
      "open_or_canopy_trigger_sqft": 700,
      "open_or_canopy_trigger_text": "Open-sided exempt up to 700 sq ft.",
      "lead_time": null,
      "fees_text": null,
      "other_rules": [],
      "notes": [],
      "test_strip": {
        "walled_400": {
          "need": "no",
          "label": "No",
          "note": "A 400 sq ft tent is not in excess of 400 sq ft."
        },
        "open_600": {
          "need": "no",
          "label": "No, if open-sided",
          "note": "A 600 sq ft open-sided tent is within the published exemption up to 700 sq ft."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft is in excess of 400 sq ft and above the 700 sq ft open-sided exemption."
        }
      },
      "sources": [
        {
          "title": "San Francisco Fire Department Bulletin 2.13 (2025)",
          "url": "https://sf-fire.org/media/3961",
          "quote": "Bulletin applies to tents in excess of 400 sq ft. Open-sided exempt up to 700 sq ft.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/san-francisco/",
      "embed_url": "https://tentrentalhq.com/embed/permit/san-francisco/"
    },
    {
      "slug": "san-diego-county",
      "name": "San Diego County",
      "legal_name": "San Diego County (CAL FIRE / 2022 CFC 3103.2)",
      "state": "CA",
      "kind": "county",
      "status": "sourced",
      "metro_slug": "san-diego",
      "walled_trigger_sqft": 400,
      "walled_trigger_text": "More than 400 sq ft (2022 CFC 3103.2), with the 700 sq ft open-sided exception.",
      "open_or_canopy_trigger_sqft": 700,
      "open_or_canopy_trigger_text": "Individual tents open on all sides that exceed 700 sq ft, or multiple open-sided tents with an aggregate area more than 700 sq ft if not separated by at least 12 ft.",
      "lead_time": null,
      "fees_text": null,
      "other_rules": [],
      "notes": [],
      "test_strip": {
        "walled_400": {
          "need": "no",
          "label": "No",
          "note": "A 400 sq ft tent is not more than 400 sq ft under 2022 CFC 3103.2 as quoted in the county checklist."
        },
        "open_600": {
          "need": "no",
          "label": "No, if open-sided and separated",
          "note": "A 600 sq ft open-sided tent does not exceed 700 sq ft."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft is more than 400 sq ft and exceeds the 700 sq ft open-sided exception."
        }
      },
      "sources": [
        {
          "title": "San Diego County Temporary Tents Checklist (2026 documents)",
          "url": "https://www.sandiegocounty.gov/content/dam/sdc/deh/pod/2026-documents/Temporary%20Tents%20Checklist.pdf",
          "quote": "Tents and membrane structures having an area more than 400 square feet shall not be erected, operated, or maintained for any purpose without first obtaining a permit and approval from the fire code official. Individual tents open on all sides that exceed 700 square feet, or multiple tents open on all sides with an aggregate area more than 700 square feet if not separated by at least 12’.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/san-diego-county/",
      "embed_url": "https://tentrentalhq.com/embed/permit/san-diego-county/"
    },
    {
      "slug": "santa-clara-county",
      "name": "Santa Clara County",
      "legal_name": "Santa Clara County Fire Department (2025 CFC)",
      "state": "CA",
      "kind": "county",
      "status": "sourced",
      "metro_slug": null,
      "walled_trigger_sqft": 400,
      "walled_trigger_text": "An operational permit is required for a tent having an area in excess of 400 sq ft (2025 CFC §105.5.51).",
      "open_or_canopy_trigger_sqft": 700,
      "open_or_canopy_trigger_text": "Tents open on all sides are excepted if each is at most 700 sq ft, the aggregate of tents without a 12 ft fire break does not exceed 700 sq ft, and a 12 ft clearance to structures and other tents is provided.",
      "lead_time": null,
      "fees_text": null,
      "other_rules": [],
      "notes": [],
      "test_strip": {
        "walled_400": {
          "need": "no",
          "label": "No",
          "note": "A 400 sq ft tent is not in excess of 400 sq ft."
        },
        "open_600": {
          "need": "no",
          "label": "No, if the listed conditions are met",
          "note": "A 600 sq ft open-sided tent is under the 700 sq ft individual and aggregate limits, if the 12 ft clearance is provided."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft is in excess of 400 sq ft and above the 700 sq ft open-sided exception."
        }
      },
      "sources": [
        {
          "title": "Santa Clara County Fire Department Standard T-1 (dated 10.13.2026 in the file name)",
          "url": "https://www.sccfd.org/wp-content/uploads/documents/fire_prevention/standards/Standards%20&%20Specifications%2001082025/SD&S%20T-1%20Tents,%20Canopies,%20and%20Temporary%20Membrane%20Structures%2010.13.2026.pdf",
          "quote": "An operational permit is required to operate an air-supported temporary membrane structure, a temporary special event structure, or a tent having an area in excess of 400 square feet (37 m2) [CFC §105.5.51]. Exceptions: … 3. Tents open on all sides, which comply with all of the following: a. Individual tents having a maximum size of 700 square feet (65 m2). b. The aggregate area of multiple tents placed side by side without a fire break clearance of not less than 12 feet (3658 mm) shall not exceed 700 square feet (65 m2) total. c. A minimum clearance of 12 feet (3658 mm) to structures and other tents shall be provided.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/santa-clara-county/",
      "embed_url": "https://tentrentalhq.com/embed/permit/santa-clara-county/"
    },
    {
      "slug": "new-york-city",
      "name": "New York City",
      "legal_name": "New York City Department of Buildings",
      "state": "NY",
      "kind": "city",
      "status": "sourced",
      "metro_slug": "new-york-city",
      "walled_trigger_sqft": 400,
      "walled_trigger_text": "Building permit exemption only for tents less than 400 gross sq ft for not more than 30 days.",
      "open_or_canopy_trigger_sqft": 400,
      "open_or_canopy_trigger_text": "The published exemption is the same for tents under 400 gross sq ft and 30 days or less.",
      "lead_time": null,
      "fees_text": null,
      "other_rules": [],
      "notes": [
        "FDNY fire-permit page and NYC Admin Code §28-111 (fees, lead time) were not used: the amlegal source returned 403 and then a timeout. Fee and lead-time cells are left blank until that source can be re-checked."
      ],
      "test_strip": {
        "walled_400": {
          "need": "yes",
          "label": "Yes (building permit)",
          "note": "A 400 sq ft tent is not less than 400 gross sq ft, so the 30-day exemption does not apply."
        },
        "open_600": {
          "need": "yes",
          "label": "Yes (building permit)",
          "note": "A 600 sq ft tent is not less than 400 gross sq ft."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes (building permit)",
          "note": "A 1,800 sq ft tent is not less than 400 gross sq ft."
        }
      },
      "sources": [
        {
          "title": "2022 NYC Building Code, Chapter 31",
          "url": "https://www.bers.nyc.gov/assets/buildings/codes-pdf/cons_codes_2022/2022BC_Chapter31_SpecConstructionWBwm.pdf",
          "quote": "Exception: No permit shall be required for: 1. The erection and use of temporary tents of less than 400 gross square feet (37 m2), for not more than 30 days.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/new-york-city/",
      "embed_url": "https://tentrentalhq.com/embed/permit/new-york-city/"
    },
    {
      "slug": "chicago",
      "name": "Chicago",
      "legal_name": "City of Chicago Department of Buildings",
      "state": "IL",
      "kind": "city",
      "status": "sourced",
      "metro_slug": "chicago",
      "walled_trigger_sqft": 400,
      "walled_trigger_text": "No building permit at 400 sq ft or less and 15 ft or lower. 401–600 sq ft (≤15 ft) can use drawings by “any responsible person.”",
      "open_or_canopy_trigger_sqft": 400,
      "open_or_canopy_trigger_text": "The published building-permit path is by area and height, not by walled vs. open-sided.",
      "lead_time": null,
      "fees_text": null,
      "other_rules": [],
      "notes": [],
      "test_strip": {
        "walled_400": {
          "need": "conditional",
          "label": "No building permit if 15 ft or lower",
          "note": "The procedures page says no building permit at 400 sq ft or less and 15 ft or lower. We do not assume a 20×20 tent’s height."
        },
        "open_600": {
          "need": "yes",
          "label": "Yes (simplified drawings if ≤15 ft)",
          "note": "401–600 sq ft (≤15 ft) can use drawings by “any responsible person,” which is still a permit path."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "1,800 sq ft is above the 401–600 sq ft simplified-drawings band."
        }
      },
      "sources": [
        {
          "title": "Chicago Department of Buildings, temporary tent procedures",
          "url": "https://www.chicago.gov/city/en/depts/bldgs/supp_info/tempstructures/tents.html",
          "quote": "No building permit at 400 sq ft or less and 15 ft or lower. 401–600 sq ft (≤15 ft) can use drawings by “any responsible person.”",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/chicago/",
      "embed_url": "https://tentrentalhq.com/embed/permit/chicago/"
    },
    {
      "slug": "phoenix",
      "name": "Phoenix",
      "legal_name": "City of Phoenix",
      "state": "AZ",
      "kind": "city",
      "status": "sourced",
      "metro_slug": "phoenix-scottsdale",
      "walled_trigger_sqft": 800,
      "walled_trigger_text": "Tents in excess of 800 sq ft or canopies in excess of 1,200 sq ft.",
      "open_or_canopy_trigger_sqft": 1200,
      "open_or_canopy_trigger_text": "Canopies in excess of 1,200 sq ft.",
      "lead_time": "$25/day late fee if filed within 10 business days.",
      "fees_text": "Event permits (including tents) minimum 3 hours, $585. $25/day late fee if filed within 10 business days.",
      "other_rules": [],
      "notes": [],
      "test_strip": {
        "walled_400": {
          "need": "no",
          "label": "No",
          "note": "A 400 sq ft tent is not in excess of 800 sq ft."
        },
        "open_600": {
          "need": "no",
          "label": "No",
          "note": "A 600 sq ft canopy is not in excess of 1,200 sq ft."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "A 1,800 sq ft tent is in excess of 800 sq ft (and a 1,800 sq ft canopy would be in excess of 1,200 sq ft)."
        }
      },
      "sources": [
        {
          "title": "Phoenix, outdoor events / temporary assembly permits",
          "url": "https://www.phoenix.gov/administration/departments/pdd/tools-resources/temporary-assembly-permits/outdoor-events.html",
          "quote": "Tents in excess of 800 sq ft or canopies in excess of 1,200 sq ft.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        },
        {
          "title": "Phoenix Fire Prevention Fee Schedule, effective 1-20-2026",
          "url": "https://www.phoenix.gov/content/dam/phoenix/firesite/documents/Fire%20Prevention%20Fee%20Schedule%20Effective%201-20-2026.pdf",
          "quote": "$25/day late fee if filed within 10 business days. Event permits (incl. tents) minimum 3 hours, $585.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/phoenix/",
      "embed_url": "https://tentrentalhq.com/embed/permit/phoenix/"
    },
    {
      "slug": "houston",
      "name": "Houston",
      "legal_name": "City of Houston (HFD LSB Standard 22, Rev. 05, effective 1/1/2024)",
      "state": "TX",
      "kind": "city",
      "status": "sourced",
      "metro_slug": "houston",
      "walled_trigger_sqft": 1200,
      "walled_trigger_text": "Tents, canopies and membrane structures 1,200 sq ft or more.",
      "open_or_canopy_trigger_sqft": 1200,
      "open_or_canopy_trigger_text": "Tents, canopies and membrane structures 1,200 sq ft or more.",
      "lead_time": "Applications filed less than 5 days before the event incur a priority inspection fee.",
      "fees_text": null,
      "other_rules": [],
      "notes": [
        "A priority inspection fee applies to applications filed less than 5 days before the event; the dollar amount was not extracted in the sourced brief."
      ],
      "test_strip": {
        "walled_400": {
          "need": "no",
          "label": "No",
          "note": "A 400 sq ft tent is under 1,200 sq ft."
        },
        "open_600": {
          "need": "no",
          "label": "No",
          "note": "A 600 sq ft canopy is under 1,200 sq ft."
        },
        "tent_1800": {
          "need": "yes",
          "label": "Yes",
          "note": "A 1,800 sq ft tent is 1,200 sq ft or more."
        }
      },
      "sources": [
        {
          "title": "Houston Fire Department LSB Standard 22, Rev. 05 (effective 1/1/2024)",
          "url": "https://www.houstonpermittingcenter.org/media/9176/download",
          "quote": "Tents, canopies and membrane structures 1,200 sq ft or more. Applications filed less than 5 days before the event incur a priority inspection fee.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/houston/",
      "embed_url": "https://tentrentalhq.com/embed/permit/houston/"
    },
    {
      "slug": "boston",
      "name": "Boston",
      "legal_name": "City of Boston",
      "state": "MA",
      "kind": "city",
      "status": "gap",
      "metro_slug": "boston",
      "walled_trigger_sqft": null,
      "walled_trigger_text": null,
      "open_or_canopy_trigger_sqft": null,
      "open_or_canopy_trigger_text": null,
      "lead_time": null,
      "fees_text": null,
      "other_rules": [],
      "notes": [
        "The 2024 Boston tent PDF is a scanned image and does not yield extractable text. The HTML special-hazard and entertainment-permit pages we opened do not state a square-footage threshold. The city form (rev. 10/01) says open flame or temporary heat need additional permits, which is not a size trigger. Threshold cells are left blank until a text-searchable official source can be verified."
      ],
      "test_strip": {
        "walled_400": {
          "need": "unknown",
          "label": "Not published here",
          "note": "No extractable official size threshold is on file for Boston."
        },
        "open_600": {
          "need": "unknown",
          "label": "Not published here",
          "note": "No extractable official size threshold is on file for Boston."
        },
        "tent_1800": {
          "need": "unknown",
          "label": "Not published here",
          "note": "No extractable official size threshold is on file for Boston."
        }
      },
      "sources": [
        {
          "title": "City of Boston, Tents 2024 PDF",
          "url": "https://www.boston.gov/sites/default/files/file/2024/03/Tents%202024.pdf",
          "quote": "Fetched as a scanned image (HTTP 200); no extractable threshold text.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        },
        {
          "title": "Boston Fire, Erecting a Tent or Temporary Structure form (rev. 10/01)",
          "url": "https://www.cityofboston.gov/fire/pdfs/Erecting%20a%20Tent%20or%20Temp%20Struct.pdf",
          "quote": "Form only. Open flame or temporary heat need additional permits.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        },
        {
          "title": "Boston Fire Prevention, special hazards permit applications and guides",
          "url": "https://www.boston.gov/departments/fire-prevention/special-hazards-permit-applications-and-guides",
          "quote": "HTML page checked; it does not state a tent square-footage threshold.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/boston/",
      "embed_url": "https://tentrentalhq.com/embed/permit/boston/"
    },
    {
      "slug": "los-angeles",
      "name": "Los Angeles",
      "legal_name": "City of Los Angeles",
      "state": "CA",
      "kind": "city",
      "status": "gap",
      "metro_slug": "los-angeles",
      "walled_trigger_sqft": null,
      "walled_trigger_text": null,
      "open_or_canopy_trigger_sqft": null,
      "open_or_canopy_trigger_text": null,
      "lead_time": null,
      "fees_text": null,
      "other_rules": [],
      "notes": [
        "The LADBS temporary special event permit form URL returned HTML rather than a PDF, and no official square-footage threshold was extracted. Threshold cells are left blank."
      ],
      "test_strip": {
        "walled_400": {
          "need": "unknown",
          "label": "Not published here",
          "note": "No extractable official size threshold is on file for Los Angeles."
        },
        "open_600": {
          "need": "unknown",
          "label": "Not published here",
          "note": "No extractable official size threshold is on file for Los Angeles."
        },
        "tent_1800": {
          "need": "unknown",
          "label": "Not published here",
          "note": "No extractable official size threshold is on file for Los Angeles."
        }
      },
      "sources": [
        {
          "title": "LADBS, Application for Temporary Special Event Permit (IN-APP-08)",
          "url": "https://ladbs.org/docs/default-source/forms/inspection-forms/application-for-temporary-special-event-permit-in-app-08.pdf?sfvrsn=32efeb53_37",
          "quote": "The URL returned HTML rather than the PDF; no square-footage threshold was extracted.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/los-angeles/",
      "embed_url": "https://tentrentalhq.com/embed/permit/los-angeles/"
    },
    {
      "slug": "miami-dade",
      "name": "Miami-Dade County",
      "legal_name": "Miami-Dade County",
      "state": "FL",
      "kind": "county",
      "status": "partial",
      "metro_slug": "miami-palm-beach",
      "walled_trigger_sqft": null,
      "walled_trigger_text": null,
      "open_or_canopy_trigger_sqft": null,
      "open_or_canopy_trigger_text": null,
      "lead_time": null,
      "fees_text": null,
      "other_rules": [
        "Fire watch is required if a tent exceeds 1,600 sq ft or is within 100 ft of buildings.",
        "Tents must be 25 ft from streets and 30 ft from property lines."
      ],
      "notes": [
        "A fire PDF we opened did not contain the “900 sq ft” threshold some blogs repeat, so that figure is not published here. The county building brochure does publish fire-watch and setback rules, which are listed below. Those are not a permit-size trigger."
      ],
      "test_strip": {
        "walled_400": {
          "need": "unknown",
          "label": "Permit threshold not published here",
          "note": "No official permit-size trigger is on file. At 400 sq ft, the published fire-watch rule (over 1,600 sq ft or within 100 ft of buildings) is not triggered by size alone."
        },
        "open_600": {
          "need": "unknown",
          "label": "Permit threshold not published here",
          "note": "No official permit-size trigger is on file. At 600 sq ft, the published fire-watch rule is not triggered by size alone."
        },
        "tent_1800": {
          "need": "conditional",
          "label": "Fire watch by size; permit threshold not published here",
          "note": "A 1,800 sq ft tent exceeds 1,600 sq ft, so the brochure requires a fire watch. That is not the same as a permit-size trigger, which we do not have from an official source."
        }
      },
      "sources": [
        {
          "title": "Miami-Dade County, permitting membrane structures brochure",
          "url": "https://www.miamidade.gov/permits/library/brochures/permitting-membrane-structures.pdf",
          "quote": "Fire watch is required if a tent exceeds 1,600 sq ft or is within 100 ft of buildings, and tents must be 25 ft from streets and 30 ft from property lines.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        },
        {
          "title": "Miami-Dade Fire, Event Tents handout",
          "url": "https://www.miamidade.gov/fire/library/Event-Tents_English-Spanish.pdf",
          "quote": "Opened (HTTP 200); no permit-size threshold found. Not used for a threshold.",
          "last_verified": "2026-11-22",
          "last_verified_s": "November 22, 2026"
        }
      ],
      "page_url": "https://tentrentalhq.com/permit-atlas/miami-dade/",
      "embed_url": "https://tentrentalhq.com/embed/permit/miami-dade/"
    }
  ]
}