Open data
Tent Permit Threshold Atlas
When a tent needs a fire or building permit is a local question. In the cities we have sourced, the walled-tent trigger runs from 200 sq ft (Denver and Nashville) to 1,200 sq ft (Houston). The same 20x20 (400 sq ft) walled tent can need a permit in one city and not in another. Every cell below traces to an official page, last verified November 22, 2026.
On this atlas: 13 jurisdictions with a sourced size trigger, 2 with a blank threshold (Boston, Los Angeles), and 1 with other published rules but no permit-size trigger on file (Miami-Dade). New York City fees are left blank until that source can be re-checked. This is not a permit ledger of issued permits.
Map of walled-tent triggers
The 20x20 / 600 / 1,800 test
Each row applies the published rule to a 400 sq ft walled tent, a 600 sq ft open-sided canopy, and a 1,800 sq ft tent. Where a rule depends on height, clearance or distance to a building, the cell says so instead of guessing.
| Jurisdiction | Walled / tent trigger | Open-sided or canopy | 20x20 walled (400) | 20x30 open (600) | 30x60 (1,800) | Lead time / fee (as published) | Last verified |
|---|---|---|---|---|---|---|---|
| Las Vegas, NV | Operational permit for a tent in excess of 400 sq ft. | Open-on-all-sides tents exempt up to 700 sq ft (individual or aggregate without a 12 ft fire break) with 12 ft clearance. | No | No, if conditions are met | Yes | — | November 22, 2026 |
| Denver, CO | Permits for tents 200 sq ft or larger and canopies 400 sq ft and larger. | Canopies 400 sq ft and larger. | Yes | Yes | Yes | Initial applications 30 days before the event. | November 22, 2026 |
| Nashville, TN | Tent in excess of 200 sq ft or canopy in excess of 400 sq ft. | Canopy in excess of 400 sq ft. | Yes | Yes | Yes | — | November 22, 2026 |
| Portland, OR, OR | 400 sq ft or more with 3 or more walls, or any tent 700 sq ft or greater. | Any tent or membrane structure with or without walls that is 700 sq ft or greater. Side-by-side tents over 700 sq ft aggregate without a 12 ft fire break also need a permit. | Yes | No | Yes | A complete application packet must be received no later than 21 calendar days before the use date; late filings may be charged double fees. · $250 (4 days or less) / $375 (5 days to 6 months). | November 22, 2026 |
| Seattle, WA | More than 400 sq ft. Roof-only exempt up to 700 sq ft. | Roof-only tents exempt up to 700 sq ft. | Sources disagree at exactly 400 sq ft | No, if roof-only | Yes | 30 calendar days to avoid a late fee. Permits last up to 28 days. | November 22, 2026 |
| Austin, TX | >400 sq ft with one or more sidewalls, >400 sq ft within 20 ft of a building, or any structure >700 sq ft. | Any structure greater than 700 sq ft, or greater than 400 sq ft within 20 ft of a building. | No, at exactly 400 sq ft | Not automatically | Yes | Due 10 days before the event (events under 50 people); ACE application 30 days before. · $375 first tent, $75 each additional. | November 22, 2026 |
| San Francisco, CA | Bulletin applies to tents in excess of 400 sq ft. Open-sided exempt up to 700 sq ft. | Open-sided exempt up to 700 sq ft. | No | No, if open-sided | Yes | — | November 22, 2026 |
| San Diego County, CA | More than 400 sq ft (2022 CFC 3103.2), with the 700 sq ft open-sided exception. | Individual tents open on all sides that exceed 700 sq ft, or multiple open-sided tents with an aggregate area more than 700 sq ft if not separated by at least 12 ft. | No | No, if open-sided and separated | Yes | — | November 22, 2026 |
| Santa Clara County, CA | An operational permit is required for a tent having an area in excess of 400 sq ft (2025 CFC §105.5.51). | Tents open on all sides are excepted if each is at most 700 sq ft, the aggregate of tents without a 12 ft fire break does not exceed 700 sq ft, and a 12 ft clearance to structures and other tents is provided. | No | No, if the listed conditions are met | Yes | — | November 22, 2026 |
| New York City, NY | Building permit exemption only for tents less than 400 gross sq ft for not more than 30 days. | The published exemption is the same for tents under 400 gross sq ft and 30 days or less. | Yes (building permit) | Yes (building permit) | Yes (building permit) | — | November 22, 2026 |
| Chicago, IL | No building permit at 400 sq ft or less and 15 ft or lower. 401–600 sq ft (≤15 ft) can use drawings by “any responsible person.” | The published building-permit path is by area and height, not by walled vs. open-sided. | No building permit if 15 ft or lower | Yes (simplified drawings if ≤15 ft) | Yes | — | November 22, 2026 |
| Phoenix, AZ | Tents in excess of 800 sq ft or canopies in excess of 1,200 sq ft. | Canopies in excess of 1,200 sq ft. | No | No | Yes | $25/day late fee if filed within 10 business days. · Event permits (including tents) minimum 3 hours, $585. $25/day late fee if filed within 10 business days. | November 22, 2026 |
| Houston, TX | Tents, canopies and membrane structures 1,200 sq ft or more. | Tents, canopies and membrane structures 1,200 sq ft or more. | No | No | Yes | Applications filed less than 5 days before the event incur a priority inspection fee. | November 22, 2026 |
| Boston, MA | — | — | Not published here | Not published here | Not published here | — | November 22, 2026 |
| Los Angeles, CA | — | — | Not published here | Not published here | Not published here | — | November 22, 2026 |
| Miami-Dade County, FL | — | — | Permit threshold not published here | Permit threshold not published here | Fire watch by size; permit threshold not published here | — | November 22, 2026 |
City and county pages
Download and cite
- API JSON (CC BY 4.0): /api/v1/permit-atlas.json
- CSV: tent-permit-threshold-atlas.csv
- Boundaries (Census 2024 CB GeoJSON): boundaries.geojson
- Embed a city card from the widgets gallery (each embed is noindex, with a canonical and a visible credit).
Related: Tent permits and fire code by size · NFPA 701 certificates.
What this atlas does not include
- The tent permit ledger of issued Chicago, NYC, Boston and Cambridge permits is not part of this atlas.
- A 900 sq ft Miami-Dade fire-permit figure that appears on some blogs is omitted because the official fire PDF we opened did not contain it.
- New York City fee and lead-time figures are omitted until the Admin Code source can be re-checked (previous fetch returned 403, then a timeout).